Tuesday, December 26, 2006

How to demolish a kitchen and Rebuild


2/23 All Done



2/21 Granite installation


2/21 Granite installation


2/21 Granite Cutting


2/20/ Appliances install



2/19 4PM Putting up cabinets


2/17 Laying the inserts


2/17 The grout



2/15 Thinsetting the tiles


2/15 Noon Tiling begins



Feb 13 5PM Painting and laying the backerboard for the tiling


Feb 13 11:30 AM Primer


Feb 13 10:30AM Finessing the texture


Feb 12th Texturing begins



Feb 11th - More Tape out ('Taping')


Feb 11th - Tape out ('Taping')



Feb 10th Noon - Inspection done, putting up the drywall



Feb 6th - The slow electrical and plumbing stuff




Feb 4th 2PM - Ripping out tiles - part 2


Feb 4th Noon - Ripping our tiles - part 1



Feb 3rd Evening - All gone. The floor gets ripped next.



Feb 3rd 10AM - Cabinets and Countertop demo



Feb 3rd 8AM - The ripping begins